Construction continues to move at a swift pace. We are working to complete the exterior walls and roof to enclose the casino. In the interior, we have begun laying the brickwork to the ground and first floor, laying rebar for the ground floor slab, and installing the formwork for the interior staircase. Weather conditions have been mostly favorable with temperatures in the range of the low 70s to low 90s with a few days of sporadic rainfall.
View of Front Side of Casino
View of Front Side of Casino and Main Entrance
Internal View of Steel Frame for Casino Hall Ceiling